The inside finish surface comprising 50% or more of the surface area for each vertical section forming an internal perimeter.
The inside finished surface comprising more than 50% of the floor to ceiling height for each IDF Wall Portion. If such does not occur, then the Finished Surface is deemed to be the IDF.
© Stevenson Systems 2016